HOHN was contracted by CNOOCC to provide a specialised work force to carry out the floating hose change for Floating Platform Storage Offshore (FPSO) systems in south sea area of China.
Services provided
- Assembly of the new floating hose string of 20inch hoses
- Leak test of the new floating hoses
- Launching and towing of the new hoses to the FPSO
- Disconnection of the old hose from the FPSO
- Installation of the new floating hoses
- Disassembly and cleaning of the old hose offshore
- OCIMF testing of all used hoses
- Placement of all equipment into long term storage
- All operations are conducted strictly in accordance with the Ship to Ship Transfer Guide for Petroleum, Chemicals and Liquefied/Gases